Chế độ
Chế độ luyện
Chế độ
Chế độ luyện
Thời gian mục tiêu
20 min
Số câu
3
Điểm bằng chứng
—
IELTS Academic Reading · Exam workspace
Câu hỏi được hiển thị bằng tiếng Anh để giống mặt bài thi thật. Chỉ bật dịch khi cần hiểu nghĩa câu hỏi hoặc đáp án.
Reading Passage
Coastal adaptation, managed realignment and the evidence needed before a defence line is moved
539
từ
MR-A1Coasts are often drawn on planning maps as if they were fixed edges, yet a shore is better understood as a moving system of water, sediment, wind and human intervention.
MR-A2A beach may narrow after a winter storm, rebuild during calmer months and then retreat again when waves arrive from a different direction.
MR-A3This movement is not automatically a sign that nature has failed; it is one way in which a coast exchanges energy and material.
MR-B1Hard defences such as sea walls, revetments and groynes can be essential where dense housing, ports or hospitals occupy low ground.
MR-B2However, they also encourage society to treat the defence line as permanent, even when the physical coast continues to adjust around it.
MR-B3If sea level rises or sediment supply falls, maintaining the same line may require repeated raising, deeper foundations and emergency repairs after severe storms.
MR-B4In some places the wall survives, but the beach in front of it becomes lower and narrower, reducing the natural buffer that once helped absorb wave energy.
MR-C1Managed realignment takes a different approach by moving or breaching a flood bank so that selected low-lying land can flood more frequently.
MR-C2Over time, saltmarsh vegetation may grow on the newly wetted surface, trapping fine sediment and forming a flexible buffer between the sea and inland assets.
MR-C3The marsh does not remove all flood risk, but it can dissipate wave energy, create habitat and reduce the pressure placed on a single hard structure.
MR-D1The choice is sometimes presented as a simple contest between engineering and nature, but that is misleading.
MR-D2A realignment project needs land, legal agreement, compensation, sediment supply, water quality and a community that understands why the old line is being changed.
MR-D3Sites with too little incoming sediment may remain as open water rather than developing into marsh, while polluted water can limit ecological recovery.
MR-D4For this reason, managed realignment is not a universal replacement for conventional defence; it is a strategy that must fit local physical and social conditions.
MR-E1After a scheme is completed, attractive photographs of birds and open water can make the project appear successful, but they are not enough evidence.
MR-E2Engineers and ecologists need repeated measurements of ground elevation, vegetation cover, wave attenuation, water levels and maintenance costs.
MR-E3The most useful evaluations compare performance during ordinary tides with performance during storms, because the value of a buffer is clearest when the system is stressed.
MR-F1A crowded waterfront district may still need a high wall because the consequences of flooding are immediate and severe.
MR-F2A sparsely populated agricultural margin, by contrast, may gain more from a controlled realignment that lowers maintenance costs and creates a wider floodplain.
MR-F3Many adaptation plans therefore combine walls in one location and restored marsh elsewhere, rather than applying a single solution along the entire coast.
MR-G1The hardest part of moving a defence line may be communication rather than construction.
MR-G2Residents may hear the word retreat as surrender, even when the plan is designed to reduce long-term risk.
MR-G3Public trust improves when authorities explain the evidence, the remaining uncertainty and the trigger points that would lead to further action.
MR-G4A shoreline that is allowed to move is therefore not an absence of engineering judgement, but a different form of it.
Questions
Questions 1–3
Do the following statements agree with the information given in the passage? Write TRUE, FALSE or NOT GIVEN.
TRUE / FALSE / NOT GIVEN
TRUE / FALSE / NOT GIVEN
TRUE / FALSE / NOT GIVEN
Báo cáo chẩn đoán
Báo cáo chẩn đoán phân tích kỹ năng, bẫy chủ đạo, kỷ luật điền đáp án và độ đúng theo dạng câu. Đây là báo cáo học nội bộ, không phải band IELTS chính thức.
Bản đồ paraphrase
Wording câu hỏi
always make future maintenance cheaper
Wording trong bài
may require repeated raising, deeper foundations and emergency repairs
Câu hỏi đảo ngược hướng của bằng chứng.
Wording câu hỏi
every major delta
Wording trong bài
not a universal replacement
Bài giới hạn phạm vi chiến lược nhưng không đưa dữ liệu thử nghiệm toàn cầu.
Wording câu hỏi
photographs alone are insufficient
Wording trong bài
photographs ... are not enough evidence
Phát biểu paraphrase trực tiếp bằng chứng ở đoạn E.